Monroe Connector/Bypass
Final EIS & Information
Timeline
| Completed | Draft Environmental Impact Statement |
| Completed | Final Environmental Impact Statement |
| 2nd Quarter 2010 | Record of Decision |
| Late 2014 | Project Open to Traffic |
Final EIS May 2010 (by Section)
Preface
This Preface lists the lead agencies and their contact information, provides background on the National Environmental Policy Act, explains how the Final Environmental Impact Statement (EIS) will be used, and describes the organization of this Final EIS. A brief history of the project is included along with an update on activities since the Draft EIS.
Section 1 - Draft EIS Summary and Updates
Section 1 provides a summary of information presented in the Draft EIS for the Monroe Connector/Bypass (March 2009). The information in this section is presented in the same order as in the Draft EIS. This section also contains, where indicated, clarification and updates such as changes in the existing environment or changes in guidance documents. Errata related to the Draft EIS is included in Appendix A.
Section 2 - Preferred Alternative
Section 2 describes the Preferred Alternative and reasons for selecting DSA D as the Preferred Alternative. This section also describes additional design work and other studies completed for the Preferred Alternative and presents updated impacts associated with the Preferred Alternative.
Section 3 - Comments and Coordination
Section 3 details coordination efforts with the public, as well as federal, state, and local agencies, that have taken place since the Draft EIS was circulated in March 2009. A summary of substantive comments on the Draft EIS and responses to those comments also are included.
Section 5 - List of Agencies, Organizations, & Persons of Whom Copies of the Statement are Sent
Appendices
Final EIS Supporting Documents
| July 2009 | Freshwater Mussel Survey Report | 94MB |
| January 2010 | Addendum Traffic Noise Technical memorandum | 6MB |
| February 2010 | Review for Potential On-Site Mitigation Technical Memorandum | 3MB |
| February 2010 | Final Addendum to Year 2035 Build Traffic Operations Technical Memorandum | 4MB |
| March 2010 | Archaeological Inventory and Evaluation for the US 74 Monroe Connector | 38MB |
| April 2010 | Monroe Connector/Bypass Service Road Study | 43MB |
| April 2010 | Indirect and Cumulative Effects Quantitative Analysis | 14MB |
| May 2010 | Biological Assessment | 61MB |
April 2010
Indirect and Cumulative Effects Water Quality Analysis
8MB

230KB